5300 Molson
Location :
Montreal
Type of structure :Concrete
Collaborater :
Cogir
Architect :Régis Coté et associés
Construction of a prestigious 7-story building housing condominiums and a SOBEYS grocery store on the ground floor with a 70,000 sq. Ft. Delivery dock with two underground basements. The building houses a roof top swimming pool on the 2nd floor, as well as a social housing floor. A structural arrangement has been designed for the loading docks.
2021 / All rights reserved